Builder. View 3 Prices. 309 Min. 2625 Max. Cost

Transparent Quotes, from vetted professionals.

Get Free Builder prices near me. 1 Quotes accepted. 1118.00 Avg price. Showing 1 to 7 of 7 entries

Pro Signup
Sno. Recent Quotes Description Created
1 Active BER Rating we are going to move house over the coming | Replies: 3
Finnstown Abbey, Lucan, County Dublin
250 BER Rating we are going to move house over the coming year. 4 bed semi detached. there is a sunroom but that was built on day 1 when the hosue was built - our neighbour said it was an option from the builder. we have an attic that is insulated but thjere is no attic conversion. we have no garage. gas boiler heating. approx 26 years old. 132 square metres. 03-2025
2 Complete Prepurchase survey of highly respected builders with | Replies: 4
93 Donnybrook Manor, Dublin 4
420 Prepurchase survey of highly respected builders with no history of issues. https://www.myhome.ie/residential/brochure/93-donnybrook-manor-donnybrook-dublin-4/4654142 04-2023
3 Accepted BER Cert 4 bed house, end of terrace, fully renovated | Replies: 1
Botanic, Dublin, D09 DC95
309 BER Cert 4 bed house, end of terrace, fully renovated Dec'22, builder still available for queries. 4 beds, attic conversion. We need BER for Solar panels grant. 03-2023
4 Active Painter: Paint 4 bed two storey house. Indoors Walls | Replies: 2
Drumshanbo, County Leitrim
2625 Painter: Paint 4 bed two storey house. Indoors Walls and ceilings, no woodwork. It's a builders finish indoors so a bit rough. Can I have a separate quote for outdoor painting too please. 02-2023
5 Active BER Cert Hi, I have just had solar panels installed
Cornerpark, County Dublin, D22 P6W8
BER Cert Hi, I have just had solar panels installed and only require a BER cert for the SEAI grant. My home was built in 2019 and has a BER cert until December 2018 that was supplied to us by the Builder. We have since had our attic converted and had an Airtightness test carried out on our property to confirm it was still A rated. We require no energy saving advice etc, as I said the BER is only required for the SEAI grant. Thanks 02-2023
6 Active how much for a 25 m single storey extension back of
Mountrath, County Laois
how much for a 25 m single storey extension back of a kitchen to builder's finish no water plumbing or electrics plaster or paint required, thank u 02-2022
7 Active need an extension . 25sqm, to builders finish, thank
Kilkenny, County Kilkenny
need an extension . 25sqm, to builders finish, thank you 02-2022
8 Active extension builder 20 metres sq
KJs Automatic Driver's Training, Broomhill Road, Tallaght, Dublin
extension builder 20 metres sq 07-2021

Refer a friend. Each earn €20

Video Explainer