1
|
Complete
BER Cert Green mortgage, semi D, 30 years old, new | Replies: 4
|
Broomfield West, County Cork, P25 H603 |
200 |
BER Cert Green mortgage, semi D, 30 years old, new boiler, new Windows, air ventilation system (recuperation), insolated walls (pumping). |
12-2023 |
2
|
Active
energy efficiency retrofit works for 2 buildings. gross
|
Wicklow |
|
energy efficiency retrofit works for 2 buildings. gross size aprox 3K m2. Energy measures include new windows, doors, roof lights, roof insulation, roof finishes, pumped bonded bead insulation to cavity walls, external wall insulation systems, external rendering, air tightness measures, internal dry lining of walls, heat pumps, photovoltaic panels, gas boilers, mechanical ventilation heat recovery system, new control systems and energy monitoring. Can you give an approx price, or price range + time frame? any questions, just ask. |
10-2023 |
3
|
Active
BER Cert 2 x provisional ber certs. We require a 1 | Replies: 3
|
Kilkenny |
1260 |
BER Cert 2 x provisional ber certs. We require a 1 + 2 bed pre ber cert. What is your lead time + approx price range / estimate?
Need to show how the house will comply with building regulations and the likely rate the dwelling is to achieve. A report shall set out exactly how the dwelling is to be constructed in areas such as design, heating systems, insulation levels, junction details, etc.
The provisional BER shall be valid for a maximum of 2 years. The quote shall not include post-construction final BER.
The quotation provided is to cover the cost of the Pre works Part (L) calculation as below.
Pre-construction for a Part (L) report/calculation to ensure that the building when built meets the requirements of the 2019 Technical Guidance Document Part(L). The report is to include a summary of the proposed insulation, windows, ventilation strategy, the intended heating system using renewables, etc.
1. Dwelling Details Report
2. Part-L Report
3. Specification to achieve Part L 2019 & NZEB Compliance |
03-2023 |
4
|
Active
BER Cert 3 bedroom house 180 sqm with usable attic | Files: 2 | Replies: 2
|
H91Y32T |
|
BER Cert 3 bedroom house 180 sqm with usable attic space of addition 70sqm. Underfloor air to water heating. Airtight with heat recovery ventilation. Ber is required for switching mortgage. Eircode provided only works on eircode website. |
09-2022 |