Provisional . View 6 Prices. 100 Min. 1260 Max.

Browse Prices

Get Free Provisional prices near me. 3 Quotes accepted. 408.83 Avg price. Showing 1 to 6 of 6 entries

Refer a friend. Each earn €20

Pro Signup
Sno. Recent Enquiries Location Description Created
1 Active BER Rating Provisional BER required for submission | Replies: 2 Crohane, County Tipperary 280 BER Rating Provisional BER required for submission with a commencement notice. Property is an 89m2 cottage in Tipperary (new build) 11-2024
2 Active BER Cert Looking for a provisional BER cert for Green | Replies: 5 Kilmainham, Dublin 100 BER Cert Looking for a provisional BER cert for Green Mortgage application. The pproject has only recently obtained planning so detail design drawings have not yet been developed. I can provide spec/build up for heat loss surfaces though. Regards, Matt 02-2024
3 Accepted BER Cert a provisional BER to start with building, | Replies: 4 Wexford, County Wexford 231 BER Cert a provisional BER to start with building, 4 bed house 08-2023
4 Accepted BER Cert Provisional BER required on self-build prior | Replies: 4 Hollywood, Co. Wicklow 263 BER Cert Provisional BER required on self-build prior to construction. 172 sqm, two storey with one storey annex. Heat pump as heating source. 04-2023
5 Active BER Cert 2 x provisional ber certs. We require a 1 | Replies: 3 Kilkenny 1260 BER Cert 2 x provisional ber certs. We require a 1 + 2 bed pre ber cert. What is your lead time + approx price range / estimate? Need to show how the house will comply with building regulations and the likely rate the dwelling is to achieve. A report shall set out exactly how the dwelling is to be constructed in areas such as design, heating systems, insulation levels, junction details, etc. The provisional BER shall be valid for a maximum of 2 years. The quote shall not include post-construction final BER. The quotation provided is to cover the cost of the Pre works Part (L) calculation as below. Pre-construction for a Part (L) report/calculation to ensure that the building when built meets the requirements of the 2019 Technical Guidance Document Part(L). The report is to include a summary of the proposed insulation, windows, ventilation strategy, the intended heating system using renewables, etc. 1. Dwelling Details Report 2. Part-L Report 3. Specification to achieve Part L 2019 & NZEB Compliance 03-2023
6 Accepted BER Cert 4 bedroom, 2 storey house, roughky 200sqm, | Files: 3 | Replies: 3 Stradone, County Cavan 263 BER Cert 4 bedroom, 2 storey house, roughky 200sqm, oil fired central with stove and back boiler, need provisional BER to send in commencement notice to council to start building 03-2023
7 Active BER Cert Can you please quote for a provisional BER | Replies: 2 Carlow, County Carlow 336 BER Cert Can you please quote for a provisional BER for the following: 1 1-bed Terraced/semi-detached house 2 2-bed Terraced/semi-detached house 3 3-bed Terraced/semi-detached house 4 4 Bed Terraced/semi-detached house 5 5-Bed Terraced/semi-detached house 6 6-Bed Terraced/semi-detached house 7 2-bed detached house 8 3-bed detached house 9 4-bed detached house 10 5-bed detached house 11 1-bed apartments 12 2-bed apartments 13 3-bed apartments 14 4-bed apartments 01-2023