1
|
Active
BER Rating seai grant application after the installation | Replies: 3
|
Rathfarnham, Dublin, D14 RY92 |
289 |
BER Rating seai grant application after the installation of solar panels. 4 bedroom semi detached house with a kitchen, a side extension and floored attic with 2 dormers. Solid concrete block construction built circa 1930. |
04-2024 |
2
|
Active
BER Cert Sale, 3 bed end of terrace, Gas heating, built | Replies: 3
|
Stepaside, County Dublin |
263 |
BER Cert Sale, 3 bed end of terrace, Gas heating, built in 2002. Timberframe construction. |
08-2023 |
3
|
Accepted
BER Cert I’m looking for a price for a post attic | Replies: 3
|
Newtown, County Dublin, D16 FF89 |
294 |
BER Cert I’m looking for a price for a post attic insulation BER cert for my 4 bed detached house in Rathfarnham. Could you please provide a quote for this?
Details below:
Address; Hayfield, Newtown lane, Mt Venus Rd. D16FF89
Approx area: 2000 sq ft
Year of construction: 1995.
Thanks and regards,
Caroline Quigley |
08-2023 |
4
|
Accepted
BER Cert per BER to satify part L of comencement notice | Files: 1 | Replies: 5
|
Valleymount, Wicklow |
310 |
BER Cert per BER to satify part L of comencement notice 3 bed bungalow , UFH ,ICF construction 185sm |
05-2023 |
5
|
Active
BER Cert 297m2. Stand-alone , greenfield site construction | Replies: 2
|
Limerick, County Limerick |
1050 |
BER Cert 297m2. Stand-alone , greenfield site construction . Steel frame structure |
04-2023 |
6
|
Accepted
BER Cert Provisional BER required on self-build prior | Replies: 4
|
Hollywood, Co. Wicklow |
263 |
BER Cert Provisional BER required on self-build prior to construction. 172 sqm, two storey with one storey annex. Heat pump as heating source. |
04-2023 |
7
|
Active
BER Cert Hi. Looking to get a pre BER for new build | Files: 1 | Replies: 2
|
Moyra, Ardagh, Co Longford |
473 |
BER Cert Hi. Looking to get a pre BER for new build commencement notice. Can you send me a quote if you are available? Longford based. Planning ref 2326. the proposed construction of a bungalow type dwelling, detached domestic garage, site entrance, boundary fence, proprietary wastewater treatment system & percolation area & all ancillary site works |
04-2023 |
8
|
Active
BER Cert 2 x provisional ber certs. We require a 1 | Replies: 3
|
Kilkenny |
1260 |
BER Cert 2 x provisional ber certs. We require a 1 + 2 bed pre ber cert. What is your lead time + approx price range / estimate?
Need to show how the house will comply with building regulations and the likely rate the dwelling is to achieve. A report shall set out exactly how the dwelling is to be constructed in areas such as design, heating systems, insulation levels, junction details, etc.
The provisional BER shall be valid for a maximum of 2 years. The quote shall not include post-construction final BER.
The quotation provided is to cover the cost of the Pre works Part (L) calculation as below.
Pre-construction for a Part (L) report/calculation to ensure that the building when built meets the requirements of the 2019 Technical Guidance Document Part(L). The report is to include a summary of the proposed insulation, windows, ventilation strategy, the intended heating system using renewables, etc.
1. Dwelling Details Report
2. Part-L Report
3. Specification to achieve Part L 2019 & NZEB Compliance |
03-2023 |
9
|
Active
BER Cert 3 bed, semi detach, new build | Replies: 2
|
Janeville Carrigaline. New Development by Astra Construction., Janeville, Cork Road, Shannonpark, Carrigaline, County Cork |
275 |
BER Cert 3 bed, semi detach, new build |
11-2022 |
10
|
Active
we are a small construction business and require a | Files: 1
|
leinst |
|
we are a small construction business and require a roofing & building website similar to the image attached, can you help? |
07-2022 |